-+ 0.00%
-+ 0.00%
-+ 0.00%

Nord Precious Metals advances engineering, permitting for Gowganda Silver Tailings recovery project

PUBT·09/29/2026 11:34:13
Nord Precious Metals advances engineering, permitting for Gowganda Silver Tailings recovery project
  • Nord highlighted its Gowganda Silver Tailings Project as it advances engineering and permitting for a surface tailings silver-recovery operation.
  • Project work is defining mineral-processing equipment needs and process-water systems, including plans to draw water from underground mines.
  • Canada’s proposed “Productivity Mega Deduction” would allow 100% expensing of eligible equipment acquired on or after Sept. 15, 2026.
  • Draft tax measures remained unenacted as of Sept. 26, 2026, leaving eligibility of Gowganda-related spending unresolved.
  • Nord reported C$ 29.93 million in non-capital tax-loss carryforwards at Dec. 31, 2025, which could limit near-term cash tax benefits.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Nord Precious Metals Mining Inc. published the original content used to generate this news brief via TheNewswire (Ref. ID: 202609290730TNWSWRCACNPR_____1AD4FrQ1X) on September 29, 2026, and is solely responsible for the information contained therein.