-+ 0.00%
-+ 0.00%
-+ 0.00%

Banyan Gold intersects 1.67 g/t gold over 32.2 meters at AurMac project

PUBT·11/23/2026 11:02:01
Banyan Gold intersects 1.67 g/t gold over 32.2 meters at AurMac project
  • Banyan Gold intersected 1.67 g/t gold over 32.2 meters in the Airstrip-Powerline gap at its AurMac project in Yukon.
  • Drillhole AX-26-910 included 31.3 g/t gold over 1.5 meters, extending high-grade mineralization down-dip from the main Airstrip zones.
  • The results were excluded from the preliminary economic assessment's resource model because they arrived beyond the data cutoff.
  • Drilling since the cutoff has exceeded 69,000 meters, with the program continuing into December 2026.
  • Follow-up drilling will test mineralization continuity; a separate high-grade footwall quartz vein is targeted for testing in 2027.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Banyan Gold Corp. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202611230600ACCESSWRNAPR_____1255486) on November 23, 2026, and is solely responsible for the information contained therein.