-+ 0.00%
-+ 0.00%
-+ 0.00%

CenterPoint Locks In 12 Gigawatts Of Industrial Power Demand, Houston Area Set For Massive 8 Gigawatt Energy Buildout By 2029

Benzinga·04/23/2026 10:23:46
Listen to the news

CenterPoint announced more than 12 gigawatts of firmly committed industrial load and increased its data center load forecast, now expecting to energize 8 gigawatts of projects in the Greater Houston area by 2029, with 3.5 gigawatts already under construction.