-+ 0.00%
-+ 0.00%
-+ 0.00%

Avax One advances Alberta 10 MW critical power facility with ASCENT as owner’s engineer

PUBT·05/06/2026 12:00:29
Listen to the news
Avax One advances Alberta 10 MW critical power facility with ASCENT as owner’s engineer
  • Avax One Technology named ASCENT Consulting as owner’s engineer for its 10 MW behind-the-meter critical power facility under development in Alberta.
  • Project moved from conceptual design into detailed engineering, targeting AESO-ready deliverables for natural-gas-fired generation with battery energy storage in an Uptime Institute Tier 3 configuration.
  • End-client deployment readiness remains targeted for Q1 2027.
  • Company framed Alberta as a C$60+ billion AI and high-performance computing power opportunity.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Avax One Technology Ltd. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202605060800PRIMZONEFULLFEED9714195) on May 06, 2026, and is solely responsible for the information contained therein.