-+ 0.00%
-+ 0.00%
-+ 0.00%

The reporter learned from the National Energy Group that today, the last unit of the Sichuan Dadu River Jinchuan Hydropower Station was officially connected to the grid, marking that the Jinchuan Hydropower Station was officially put into operation at full capacity.

Zhitongcaijing·06/20/2026 00:09:02
Listen to the news
The reporter learned from the National Energy Group that today, the last unit of the Sichuan Dadu River Jinchuan Hydropower Station was officially connected to the grid, marking that the Jinchuan Hydropower Station was officially put into operation at full capacity.