-+ 0.00%
-+ 0.00%
-+ 0.00%

IBU-tec advances Bitterfeld build-out for 15,000-ton LFP cathode materials plant

PUBT·07/15/2026 09:36:30
Listen to the news
IBU-tec advances Bitterfeld build-out for 15,000-ton LFP cathode materials plant
  • IBU-tec accelerated its Bitterfeld expansion for industrial LFP cathode material production, starting detailed engineering for the new plant.
  • A logistics hall steel frame is complete, targeting storage capacity of about 1,800 pallets; interior fit-out is scheduled over the next six months.
  • Commissioning trials for a new spray-drying tower are slated to begin in Q4 2026.
  • The LFP plant is due to start up in 2028 with annual capacity of 15,000 tons, lifting existing capacity about fivefold.
  • PowerCo has secured the full output under a contract covering at least 10 years.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. IBU-tec advanced materials AG published the original content used to generate this news brief via EQS News (Ref. ID: corporate_2366278_de) on July 15, 2026, and is solely responsible for the information contained therein.