-+ 0.00%
-+ 0.00%
-+ 0.00%

ESI wins EPC contract for Innovatec’s 6.44-MWp Calabria solar project

PUBT·07/15/2026 15:31:26
Listen to the news
ESI wins EPC contract for Innovatec’s 6.44-MWp Calabria solar project
  • ESI won a turnkey EPC contract to build a 6.44 MWp solar plant in Girifalco, Calabria, for Innovatec-controlled SPV Elios Tre.
  • Project backed by a EUR 5.9 million ESG Green Loan from BPER Banca structured on a project finance basis.
  • Construction start targeted by July 2026; plant expected to enter service in the second half of 2027.
  • ESI said the order lifts its backlog to about EUR 32.3 million, including output delivered through Dec. 31, 2025 and 2026 wins.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. ESI S.p.A. published the original content used to generate this news brief via SDIR, the Italian regulatory disclosure system (Ref. ID: 20193-18-2026_TELEBORSA.pdf), on July 15, 2026, and is solely responsible for the information contained therein.