-+ 0.00%
-+ 0.00%
-+ 0.00%

Budimex completes PLN 109.45 million Szczecin Sports Centre reconstruction project

PUBT·07/23/2026 15:14:17
Listen to the news
Budimex completes PLN 109.45 million Szczecin Sports Centre reconstruction project
  • Budimex completed the reconstruction and expansion of the Szczecin Sports Centre, covering the swimming pool complex and sports and entertainment hall.
  • The investment value was PLN 109.45 million gross; works began in 2023 under a design-and-build contract.
  • The facility has passed required technical inspections; handover to the city’s sports operator is pending final formalities.
  • The project includes a 30-meter, eight-lane pool, a sports hall with stands, upgraded spectator areas, modern screens and scoreboards.
  • Energy-saving features include 385 kWp photovoltaic panels, heat recovery, water treatment designed to recover up to 75% of flushing water.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Budimex SA published the original content used to generate this news brief on July 23, 2026, and is solely responsible for the information contained therein.