-+ 0.00%
-+ 0.00%
-+ 0.00%

At present, the city has built 1,227 supercharging stations of over 480 kilowatts, 48 supercharging stations for heavy trucks, 120 flash charging stations for passenger cars, and 15 integrated energy supply stations. The virtual power plant can adjust the load in real time by more than 1.4 million kilowatts. Accelerate the construction of a multi-scenario, multi-level, and wide-coverage charging infrastructure system. Shenzhen was selected as one of the country's first pilot cities for interactive large-scale application of vehicle networks, and built China's first optical storage and charging network and virtual power plant management platform. The pace of pioneering demonstrations is getting faster and faster. (Shenzhen Special Administrative Region Newspaper)

Zhitongcaijing·07/26/2026 00:17:02
Listen to the news
At present, the city has built 1,227 supercharging stations of over 480 kilowatts, 48 supercharging stations for heavy trucks, 120 flash charging stations for passenger cars, and 15 integrated energy supply stations. The virtual power plant can adjust the load in real time by more than 1.4 million kilowatts. Accelerate the construction of a multi-scenario, multi-level, and wide-coverage charging infrastructure system. Shenzhen was selected as one of the country's first pilot cities for interactive large-scale application of vehicle networks, and built China's first optical storage and charging network and virtual power plant management platform. The pace of pioneering demonstrations is getting faster and faster. (Shenzhen Special Administrative Region Newspaper)