-+ 0.00%
-+ 0.00%
-+ 0.00%

Recently, Unit 2 of the Sichuan Energy Investment Deyang Gas Power Generation Project constructed by China Power Construction completed 168-hour trial operation at full load and officially entered the commercial operation stage, marking that the project successfully achieved the target of double engine operation. The project is located in Kaizhou Xincheng Park, Zhongjiang County, Deyang City. It is equipped with two 700 megawatt 9H heavy gas generators. It is the highest grade gas unit in China, and is also the world's leading high-power, high-efficiency heavy-duty gas unit.

Zhitongcaijing·08/02/2026 15:01:01
Listen to the news
Recently, Unit 2 of the Sichuan Energy Investment Deyang Gas Power Generation Project constructed by China Power Construction completed 168-hour trial operation at full load and officially entered the commercial operation stage, marking that the project successfully achieved the target of double engine operation. The project is located in Kaizhou Xincheng Park, Zhongjiang County, Deyang City. It is equipped with two 700 megawatt 9H heavy gas generators. It is the highest grade gas unit in China, and is also the world's leading high-power, high-efficiency heavy-duty gas unit.