-+ 0.00%
-+ 0.00%
-+ 0.00%

Pinnacle Silver & Gold reopens El Potrero mine workings, samples up to 26.1 g/t gold and 511 g/t silver

PUBT·08/04/2026 11:08:55
Listen to the news
Pinnacle Silver & Gold reopens El Potrero mine workings, samples up to 26.1 g/t gold and 511 g/t silver
  • Pinnacle Silver & Gold reopened previously inaccessible underground workings at its El Potrero gold-silver project in Durango, Mexico for channel sampling.
  • Sampling at the Dos de Mayo Norte area returned up to 26.1 g/t gold, 511 g/t silver over 0.5 meters; 10.76 g/t gold, 215 g/t silver over 1.3 meters.
  • Combined underground results outlined a sub-vertical mineralized shoot about 30 meters along strike with at least 85 meters of vertical extent.
  • Surface drilling is planned for September-October to test gaps between historic mines, extend the Dos de Mayo vein, drill El Capulin and La Estrella.
  • The drilling and sampling results are expected to support an internal resource estimate, then a preliminary mine plan.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Pinnacle Silver & Gold Corp. published the original content used to generate this news brief via TheNewswire (Ref. ID: 202608040700TNWSWRCACNPR_____1L5PFV3dM) on August 04, 2026, and is solely responsible for the information contained therein.