-+ 0.00%
-+ 0.00%
-+ 0.00%

Barton Gold completes 39,000-meter Phase 2 drilling at Tunkillia project

PUBT·08/06/2026 01:35:19
Listen to the news
Barton Gold completes 39,000-meter Phase 2 drilling at Tunkillia project
  • Barton Gold completed Phase 2 resource upgrade drilling at the Tunkillia Gold Project, totaling 38,760 meters across 311 RC and diamond holes.
  • Total Phase 1–2 drilling reached 57,653 meters across 520 holes, targeting upgrades to JORC Indicated within optimized open pits.
  • Highest-value material in the S1 starter pit is targeted for JORC Measured classification.
  • A pre-feasibility study for large-scale gold production is underway, targeting publication in Q1 2027.
  • S1 starter pit model shows 206,000 oz gold and 491,000 oz silver at A$ 997/oz cash cost, generating over A$ 800 million operating cash.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Barton Gold Holdings Ltd. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202608052135ACCESSWRNAPR_____1203290) on August 06, 2026, and is solely responsible for the information contained therein.