-+ 0.00%
-+ 0.00%
-+ 0.00%

On August 7, 2026, NIO's 4,000 power exchange stations and the first fifth-generation power exchange station were completed at the Qiaoxiang Stadium in Quanzhou, Fujian. On the same day, NIO's first batch of fifth-generation power exchange stations were put into operation in seven cities: Beijing, Shanghai, Guangzhou, Suzhou, Hefei, Chengdu and Quanzhou. Firefly Firefly was officially connected to NIO's power exchange system.

Zhitongcaijing·08/07/2026 11:17:14
Listen to the news
On August 7, 2026, NIO's 4,000 power exchange stations and the first fifth-generation power exchange station were completed at the Qiaoxiang Stadium in Quanzhou, Fujian. On the same day, NIO's first batch of fifth-generation power exchange stations were put into operation in seven cities: Beijing, Shanghai, Guangzhou, Suzhou, Hefei, Chengdu and Quanzhou. Firefly Firefly was officially connected to NIO's power exchange system.