-+ 0.00%
-+ 0.00%
-+ 0.00%

Premier American Uranium identifies multiple mineralized uranium trends in 2026 Kaycee drilling in Wyoming

PUBT·08/17/2026 11:02:52
Listen to the news
Premier American Uranium identifies multiple mineralized uranium trends in 2026 Kaycee drilling in Wyoming
  • Premier American Uranium reported mid-season results from its 2026 Kaycee uranium drilling program in Wyoming’s Powder River Basin.
  • Completed 50 mud-rotary holes totaling 41,960 feet, about 42% of the planned 100,000-foot campaign.
  • Rustler target: 13 of 22 holes hit uranium mineralization at or above 0.02% eU3O8; best was 3.5 feet at 0.135%.
  • Drilling outlined two separate mineralized sandstone units in the lower Wasatch Formation, pointing to multiple prospective trends.
  • Outpost target: 7 of 27 holes intersected mineralization at or above 0.02% eU3O8 as the geological model is refined.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Premier American Uranium Inc. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202608170700PRIMZONECNPR____9811003) on August 17, 2026, and is solely responsible for the information contained therein.