-+ 0.00%
-+ 0.00%
-+ 0.00%

In order to ensure the safety of railway transportation and passenger travel, the railway department initiated emergency response for flood control, adopted measures such as early warning and active safe-haven measures to adjust the train operation plan. It plans to temporarily stop trains passing through some sections of the Hangzhou-Wenzhou High Speed Rail, Hangzhou-Tai High Speed Rail, Jintai Railway, Yongjin Railway and the Hangzhou-Shenzhen Railway from August 27 to 29.

Zhitongcaijing·08/26/2026 04:41:02
Listen to the news
In order to ensure the safety of railway transportation and passenger travel, the railway department initiated emergency response for flood control, adopted measures such as early warning and active safe-haven measures to adjust the train operation plan. It plans to temporarily stop trains passing through some sections of the Hangzhou-Wenzhou High Speed Rail, Hangzhou-Tai High Speed Rail, Jintai Railway, Yongjin Railway and the Hangzhou-Shenzhen Railway from August 27 to 29.