-+ 0.00%
-+ 0.00%
-+ 0.00%

The Hangde City Railway Line starts at Qihang Road Station in Yuhang District, Hangzhou, and ends at Deqing High Speed Rail Station. The total length is 25.6 kilometers. The entire line has 9 stations. It is expected to be completed and opened to traffic by the end of 2026. After it is put into use, it will be connected to Hangzhou Metro Line 10. After the opening of traffic, it takes about 40 minutes from the main city of Deqing to Huanglong in Hangzhou. The whole journey is direct with one card without transfers.

Zhitongcaijing·09/02/2026 09:33:03
Listen to the news
The Hangde City Railway Line starts at Qihang Road Station in Yuhang District, Hangzhou, and ends at Deqing High Speed Rail Station. The total length is 25.6 kilometers. The entire line has 9 stations. It is expected to be completed and opened to traffic by the end of 2026. After it is put into use, it will be connected to Hangzhou Metro Line 10. After the opening of traffic, it takes about 40 minutes from the main city of Deqing to Huanglong in Hangzhou. The whole journey is direct with one card without transfers.