-+ 0.00%
-+ 0.00%
-+ 0.00%

Aztec Minerals drills 83.8 m at 1.31 g/t AuEq at Tombstone project in Arizona

PUBT·09/02/2026 11:07:22
Listen to the news
Aztec Minerals drills 83.8 m at 1.31 g/t AuEq at Tombstone project in Arizona
  • Aztec Minerals reported new reverse-circulation drill results from its Tombstone project in Arizona, extending the Contention oxide gold-silver system.
  • Five holes in the North Extension target hit mineralization, lifting continuously drilled strike length by 255 m to more than 1,250 m.
  • Hole TR26-41 returned 83.8 m at 1.31 g/t AuEq from 24.4 m, including 7.6 m at 8.34 g/t AuEq.
  • Hole TR26-43 returned 51.8 m at 1.16 g/t AuEq from 85.3 m, including 19.8 m at 2.99 g/t AuEq.
  • Ninety-three RC holes have been completed in the 2025-2026 program; assays are pending for nine holes, including two collared north of TR26-43.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Aztec Minerals Corp. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202609020700ACCESSWRNAPR_____1215674) on September 02, 2026, and is solely responsible for the information contained therein.