-+ 0.00%
-+ 0.00%
-+ 0.00%

On September 4, with the collection of the last set of test data, the Hubei Yanji Yangtze River Bridge, which was invested by Hubei Trading and built by CCCC Second Aviation Administration, successfully completed load tests, marking that the bridge is one step closer to the target of opening to traffic by the end of the year.

Zhitongcaijing·09/05/2026 00:33:02
Listen to the news
On September 4, with the collection of the last set of test data, the Hubei Yanji Yangtze River Bridge, which was invested by Hubei Trading and built by CCCC Second Aviation Administration, successfully completed load tests, marking that the bridge is one step closer to the target of opening to traffic by the end of the year.