-+ 0.00%
-+ 0.00%
-+ 0.00%

Orvana produces first gold-silver doré bar from Don Mario oxides stockpile project in Bolivia

PUBT·09/08/2026 10:31:00
Listen to the news
Orvana produces first gold-silver doré bar from Don Mario oxides stockpile project in Bolivia
  • Orvana reported first gold-silver doré bar produced from its oxides stockpile project at the Don Mario site in Bolivia.
  • Output confirms metallurgical performance of the expanded Don Mario processing plant is tracking design assumptions.
  • Ramp-up focus remains on raising throughput, improving recoveries, progressing to commercial doré production, and enabling copper cathodes production.
  • Fiscal 2026 production will hinge on ramp-up execution, plant performance, and stabilization of operating circuits.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Orvana Minerals Corp. published the original content used to generate this news brief via CNW (Ref. ID: 202609080630CANADANWCANADAPR_C8853) on September 08, 2026, and is solely responsible for the information contained therein.