-+ 0.00%
-+ 0.00%
-+ 0.00%

According to Guodian Nanrui, on September 6, Guodian Nanrui successfully completed the monorail switching of the security architecture of the Xinjiang Electricity Consumption Information Collection System, so that the entire collection system moved into the load production control area, and the system was officially implemented and operated steadily. The successful completion of this transformation made the Xinjiang Power Grid the first provincial power grid within the national grid system to complete the upgrade of the security architecture of the collection system.

Zhitongcaijing·09/09/2026 11:57:06
Listen to the news
According to Guodian Nanrui, on September 6, Guodian Nanrui successfully completed the monorail switching of the security architecture of the Xinjiang Electricity Consumption Information Collection System, so that the entire collection system moved into the load production control area, and the system was officially implemented and operated steadily. The successful completion of this transformation made the Xinjiang Power Grid the first provincial power grid within the national grid system to complete the upgrade of the security architecture of the collection system.