-+ 0.00%
-+ 0.00%
-+ 0.00%

High Tide Resources reports 129 m of 30.2% Fe at Labrador West iron project

PUBT·09/16/2026 09:00:41
Listen to the news
High Tide Resources reports 129 m of 30.2% Fe at Labrador West iron project
  • High Tide Resources reported new drill assays from its Labrador West Iron Project, adjacent to Rio Tinto IOC’s Carol Lake mine complex.
  • Hole 26LB0071 returned 128.9 meters grading 30.2% total iron from 7.2 meters, including additional lower-grade intervals deeper in the hole.
  • Hole 26LB0072 intersected 179.6 meters grading 26.7% total iron from 161.0 meters within a 347-meter hole.
  • Results lifted the total to 13 holes with iron oxide mineralization, including 11 drilled outside the existing resource boundary.
  • Drilling totaled more than 6,150 meters across 25 holes, with two holes in progress ahead of a planned resource update later in 2026.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. High Tide Resources Corp. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202609160500ACCESSWRNAPR_____1221458) on September 16, 2026, and is solely responsible for the information contained therein.