-+ 0.00%
-+ 0.00%
-+ 0.00%

In the early morning of September 18, the Yangkui Village Bridge of the Zhangshan High Speed Rail, built by Southeast Coastal Railway Fujian Co., Ltd. and constructed by China Railway 11th Bureau Group Co., Ltd., completed the simultaneous rotation of the double pier beams in a counterclockwise direction. The beam body with a total weight of over 20,000 tons successfully crossed the Hangzhou-Shenzhen Railway to achieve accurate alignment. The Yangkui Village Bridge is located in Chengxi Town, Longhai District, Zhangzhou City, Fujian Province, with a total length of 1,545 meters. The total length of the rotating continuous beam is nearly 280 meters, the roof width is about 13 meters, and the main span is about 130 meters.

Zhitongcaijing·09/18/2026 10:09:04
Listen to the news
In the early morning of September 18, the Yangkui Village Bridge of the Zhangshan High Speed Rail, built by Southeast Coastal Railway Fujian Co., Ltd. and constructed by China Railway 11th Bureau Group Co., Ltd., completed the simultaneous rotation of the double pier beams in a counterclockwise direction. The beam body with a total weight of over 20,000 tons successfully crossed the Hangzhou-Shenzhen Railway to achieve accurate alignment. The Yangkui Village Bridge is located in Chengxi Town, Longhai District, Zhangzhou City, Fujian Province, with a total length of 1,545 meters. The total length of the rotating continuous beam is nearly 280 meters, the roof width is about 13 meters, and the main span is about 130 meters.