-+ 0.00%
-+ 0.00%
-+ 0.00%

On the morning of the 10th, construction of the new Three Gorges Water Transport Corridor Gezhouba Shipping Capacity Expansion Upstream and Downstream Weir officially began. These two weirs will jointly enclose construction areas such as banks and slopes to create prerequisites for the construction of a 10,000-ton new lock dry land. This marks that Gezhouba shipping capacity expansion has fully entered the main construction stage.

Zhitongcaijing·10/11/2026 07:49:01
Listen to the news
On the morning of the 10th, construction of the new Three Gorges Water Transport Corridor Gezhouba Shipping Capacity Expansion Upstream and Downstream Weir officially began. These two weirs will jointly enclose construction areas such as banks and slopes to create prerequisites for the construction of a 10,000-ton new lock dry land. This marks that Gezhouba shipping capacity expansion has fully entered the main construction stage.