-+ 0.00%
-+ 0.00%
-+ 0.00%

The NTT data center will be located in Osaka, and the total installed capacity is expected to reach 500 megawatts.

Zhitongcaijing·10/13/2026 02:17:04
Listen to the news
The NTT data center will be located in Osaka, and the total installed capacity is expected to reach 500 megawatts.