-+ 0.00%
-+ 0.00%
-+ 0.00%

Taeyoung E&C Selected for Detailed Design of Dongtan Urban Railway Phase 1

PUBT·10/19/2026 08:55:21
Listen to the news
Taeyoung E&C Selected for Detailed Design of Dongtan Urban Railway Phase 1
  • TAEYOUNG Engineering & Construction selected for detailed design of Hwaseong’s Dongtan urban railway phase one; selection confirmed Oct. 19, 2026.
  • Its 20% share is worth approximately KRW 138.6 billion, excluding VAT, from a total construction contract of approximately KRW 693.2 billion.
  • The company’s share represents approximately 6.37% of 2025 consolidated revenue.
  • Construction is expected to take approximately 53 months from the start of work.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. TAEYOUNG Engineering & Construction Co. Ltd. published the original content used to generate this news brief via DART, the regulatory disclosure system operated by the South Korea Financial Supervisory Service (FSS) (Ref. ID: 20261019800607), on October 19, 2026, and is solely responsible for the information contained therein.