-+ 0.00%
-+ 0.00%
-+ 0.00%

Yingjing is not the end; it is a “lane change fee”: Dragon Wing Airlines' (00918) loss structure and framework implementation logic

Zhitongcaijing·11/17/2026 06:33:52
Listen to the news

The most difficult proposition for low-altitude economy companies is never to let the plane fly to the sky, but to let the order go through the delivery process and end up in the profit statement.

The Zhitong Finance App learned that on the evening of November 16, Longyi Aviation Technology (00918) issued a profit warning: As of the first half of the year ending September 30, 2026, a net loss of 37.5 million to the mother is expected to be HK$40.5 million, compared with a profit of HK$6.1 million for the same period last year.

The market immediately turned its gaze back to the 131.5 million yuan drone framework agreement a week ago — how to understand this loss between the size of the announcement and the time difference, and how to view the framework agreement's influence on subsequent results is the key to the current valuation narrative.

First, let's take a look at the structure of losses.

According to the company's disclosure, the four factors that dragged down profits in the first half of the year were as follows: revenue from the drone business decreased by about HK$22.3 million and gross profit decreased by about HK$13.6 million; gross loss of some watch products with weak demand increased by about HK$20.8 million; drone business development costs increased by about HK$9.7 million; and drone-related impairment of goodwill increased by about HK$900,000.

A layer of financial translation is needed here: 20.8 million is not an overall loss in the watch business, but rather an increase in gross loss due to slow removal of weak and old models and channel discounts. It is a phased pain of clearing inventory; 9.7 million is not an impairment or bad debt, but rather a pre-investment in R&D and trial production before standardization, corresponding to the mold, flight control, and supply chain run-in with the mold, flight control, and supply chain of 15- to 22-inch FPV drones.

What really puts pressure on profit margins is the decline in revenue from old drone projects and the new framework has yet to enter the delivery confirmation window, creating an empty window of “old money is declining, new money has not arrived.” However, the impairment of goodwill was only 900,000, which indicates that the asset side has not deteriorated. The loss was more a time difference in business model switching than a fundamental collapse.

Now turn our attention to the framework agreement.

On November 9, the subsidiary Shandong Longyi and Shanghai Dexinyi established a two-year flexible supply framework covering 15, 18, 20, and 22-inch multi-specification drone systems, with an estimated total volume of 20,000 units, with a total framework value of RMB 131.5 billion.

What needs to be clarified is that the framework agreement itself does not constitute a mandatory procurement commitment. According to the revenue policy disclosed in the Group's annual report, drone hardware sales confirm revenue when the goods are delivered and the customer gains control; only the placement, scheduling, acceptance and repayment of subsequent purchase orders constitutes a real variable in the financial statements.

Therefore, the impact of the framework agreement on the second half of the year should be progressive in three layers:

1. The first level is a contract debt signal: if the buyer places the first order and makes an advance payment, the balance sheet will first reflect the contract liability. Although revenue is not confirmed, the operating cash flow is positive, which can reduce the cash consumption caused by development costs;

2. The second layer is the delivery acceptance switch: RMB 131.5 million, or HK$143 million, an annualized rate of about HK$71.5 million, which is close to the current annual revenue level of the drone business. If we run 20% to 30% of the first order from the fourth quarter to the first quarter of next year, and confirm revenue of about HK$28.6 million to HK$43 million. Based on historical segment gross margin, the gross profit increase is enough to hedge investment in early development and partially fill the gap in drone gross profit decline in the first half of the year;

3. The third level is annual performance characterization: even if the framework is successfully implemented, the second half of the year will still need to absorb the aftermath of watch clearance. A more reasonable expectation is that drone revenue will recover month-on-month and that losses will narrow significantly, rather than immediately reverse losses in a single quarter.

Looking at the longer story, Dragon Wing is completing an identity transition: from a “fire fighter in a fire scene” to a “standard supplier of industrial drones.” Firefighting capabilities are the cutting edge of technology credit, and framework agreements mean that products are abstracted as industrial SKUs that can be reused, scheduled, and repurchased. The buyer is willing to lock in an estimated volume of 20,000 sets for two years, which in itself is a credit endorsement of the downstream demand pool and channel capabilities; whether it can be replicated later to integrators, low-altitude operation platforms, and local state-owned assets depends on the quality of execution of the first order delivery.

The logic of market pricing should also change its anchor. Since the beginning of the year, the stock price has greatly overdrawn the low concept premium. Next, it is no longer a “who can fly” story, but the verification of “whose delivery order can stand the audit”. After the interim results are released on November 23, the month-on-month comparison between inventory preparation, contract liabilities, and operating cash flow and drone division revenue will explain the problem more than the total amount of the framework.

The essence of this profit warning is the toll that Dragon Yi switched to industrial supply: clocks are being cleared, drones are paying tuition fees, and the 131.5 million framework is the first key to breaking the situation in the second half of the year. But what capital awaits is never the paper valuation in the press release, but rather the production schedule, acceptance slip, and repayment flow — the low-altitude economy is entering a deep commercial zone, and delivery data will be more honest than the concept.