-+ 0.00%
-+ 0.00%
-+ 0.00%

Blue Moon Metals’ Springer ore-sorting tests boost tungsten grades up to 3.4 times

PUBT·11/23/2026 11:45:49
Listen to the news
Blue Moon Metals’ Springer ore-sorting tests boost tungsten grades up to 3.4 times
  • Blue Moon Metals reported positive initial ore-sorting results at its Springer tungsten mine near Imlay, Nevada, on Nov. 23, 2026.
  • Tests increased tungsten trioxide grades by 1.3 to 3.4 times, with metal recovery of 93.3% to 97.5%.
  • Sorting rejected 25.1% to 71.7% of feed mass, highlighting potential processing cost savings, particularly for lower-grade material.
  • Additional ore-sorting tests and processing plant engineering studies are planned for 2027 as Springer advances toward production.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Blue Moon Metals Inc. published the original content used to generate this news brief via PR Newswire (Ref. ID: 202611230645PR_NEWS_USPR_____TO04246) on November 23, 2026, and is solely responsible for the information contained therein.