-+ 0.00%
-+ 0.00%
-+ 0.00%

This morning, the country's first integrated water and landscape base, the two Chablang and Suolong multi-million-kilowatt photovoltaic power plants at an altitude of more than 4,000 meters above sea level, were simultaneously put into operation to generate electricity.

Zhitongcaijing·12/31/2025 09:57:01
Listen to the news
This morning, the country's first integrated water and landscape base, the two Chablang and Suolong multi-million-kilowatt photovoltaic power plants at an altitude of more than 4,000 meters above sea level, were simultaneously put into operation to generate electricity.