-+ 0.00%
-+ 0.00%
-+ 0.00%

KBR Wins Engineering Contract for New Texas LNG Export Facility

Benzinga·01/12/2026 11:19:36
Listen to the news

KBR (NYSE:KBR) has been awarded the front-end engineering design (FEED) contract for Coastal Bend's planned natural gas liquefaction and export facility on the Texas Gulf Coast.

The Coastal Bend LNG project will feature multiple liquefaction trains, cogeneration, LNG storage tanks, and export facilities. The project will utilize ConocoPhillips' Optimized Cascade® Process (COP OCP) technology to help achieve Coastal Bend LNG's goal of reducing greenhouse gas emissions. KBR will lead the FEED effort, including the entire inside battery limits (ISBL) scope–covering LNG liquefaction and nitrogen rejection (COP OCP technology), gas treatment, and heavy hydrocarbon removal (Honeywell UOP technologies). KBR will also provide overall coordination between the parties and support Coastal Bend in FERC filings and permitting.